Yacht Riggers
HOME COMPANY RIGGING SERVICES PROJECT MANAGEMENT NEWS SUPPLIERS THL YACHT STUFF CONTACT
 
 
 
 
 
4 Year Service

This service is carried every four to five years after the initial mast stepping.

This involves an initial pre-service evaluation of the rigging, based upon previous service history and a “mast in” rig check, up to six months prior to the service. The mast is then lifted from the yacht and the rigging stripped and cleaned. At this stage re-heading of all diagonals and fore and aft rigging is recommended. All rod heads (not re-headed) and fittings will be cleaned, polished and non destructive testing (NDT) performed. Further re-heading may be required subject to the results of NDT.

Service at this period includes:

> Pre-service rig check to evaluate what is required and how it might best be carried out whilst the mast is still stepped.
> Strip and clean all fittings and polish the rod heads once the mast is down.
> NDT of all rods and fittings.
> Re-heading of all diagonals and fore and aft rods and other rods if required.
> Manufacture of custom fittings to compensate for length loss of rods as necessary.
> Replace or refurbish all terminals to suit the new cold heads.
> Service all other fittings and replace where necessary.
> Visually inspect and proof test. Refer to composite cable
recommendations.
> Re-tune the mast once stepped.
> Update the Rig Log.

 
Superyacht UK British Marine Federation